When expanding a system
from one particle counter
to many, or up-grading
a portable monitoring
systems to an integrated
and automated system.
Enviroterm have the full
capability to deliver
the job. We offer a total
solution for all your
project requirements.
From initial system design
to installation to final
system sign off, our team
of experienced project
engineers provide quality
project completion.
System Installation
The project and installtion
team, working with your
site-appointed contractors
or our own approved network
of electrical & mechanical
contractors, provides
the quality expected in
the regulated environment.
Factory Acceptance
Testing
Factory Acceptance test
is a major milestone in
qualifying a system prior
to delivery to site. The
system is fully built
using all the system components
and is tested to approved
test protocol. Testing
verifies that the system
meets the acceptance criteria
and system design. On
completion of testing,
the system is shipped
to the site.
Site Acceptance
Testing
Site Acceptance Testing
is the final stage in
ensuring the system meets
design and requirement
specifications, test are
perform on site to ensure
installation complies
to the standards and system
operates as expected.
Testing includes verification
of location, system functionality
and security of data.
Documentation is written
to GAMP or IQ/OQ requirements
or both. System users
or their appointed representatives
witness all testing performed.
A final report of all
system testing is issued
to close the validation
requirement.
|